KOHESIO · Q7495335 · GR
Construction of the Provincial Road of KastoriaPtolemaida Section of the stream of Kotourioria in the Prefecture of Kozani with tunnel in Klisoura Phase B
The project includes the construction of the dyeing of the road section on the Provincial Road of KastoriaPtolemaida from the Kotouri stream to the boundaries of the Prefecture of Kozani including the Klisouras Tunnel It is a road section with a total length of 1040 km XTH 18275 XTH 2867500 with a total road width of 80m with a traffic lane width of 375m per direction and an additional guidance strip width of 025m In areas with an uphill slope of more than 6 a 35m wide idling strip is added for the movement of heavy vehicles It includes technical works such as the Klisouras Tunnel with a leng…
Co-funding: the EU contributes €51.7M toward a total project cost of €63.1M — a co-funding rate of 82%, with the remainder covered by national, regional or private sources.
Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.
Full project record on Kohesio — partners, deliverables, location map, related funding decisions.
Open on kohesio.ec.europa.eu →More projects in GR
see all →- BRONZE DETENTION AND SEARCH DETENTIONQ7481776 · €196.4M
- Collection Urban wastewater treatment of the Municipalities of RafinaPikermi and SpataArtemidos and ReuseDisposal of treated effluents Phase IIQ7496867 · €143.7M
- Vertical Axis E61 Egnatia Road KavalaDramaSerres Section AK Krinidonik Stavrou B' PHASEQ7497541 · €48.5M
- Support for unified systematic attendance and inclusion in education of students with disabilities or special educational needs SMEAE TE school year 20252026Q7490787 · €46.4M
- Development of innovations in the field of lithium batteries for the energy storage industryQ7481068 · €41.3M
- Replacement of energy-intensive electric water heaters with new modern technologyQ7490132 · €40.9M
Same objective, other countries
see all →- Highway Sibiu - FagarasQ7416222 · RO · €561.7M
- Ruse – Veliko Tarnovo Motorway from km 0+400 to km 76+040Q7445163 · BG · €445.6M
- Construction of the S6 section. Słupsk – DK6 (Bożepole Wielkie)Q7374976 · PL · €345.0M
- Integrated infrastructure for the orbital area of Bucharest - Phase IIQ7416799 · RO · €335.8M
- Construction of the S7 road, sec. Płońsk (S10) – GarlicQ7374962 · PL · €299.2M
- Construction of the Tri-City Metropolis bypassQ7374975 · PL · €255.6M
Frequently asked questions
- What is the EU budget for this project?
- The EU contributes €51.7M toward a total project cost of €63.1M, a co-funding rate of 82%.
- Which fund or thematic objective does it belong to?
- This project falls under EU Cohesion Policy thematic objective PO03 — PO03 — financed through the European Structural and Investment Funds.
- Which country is the project located in?
- The project is located in GR.
- What is the project period?
- The project runs from 2023-11-07 to 2027-04-30.
- Where can I find the full project record?
- The complete project record — beneficiary, location and related funding decisions — is published on Kohesio, the European Commission's open-data platform, under reference Q7495335.