PV-GUM Manufacturing technologies and equipment to produce low-cost PV bituminous-modified roofing membrane with full integration of high efficiency flexible thin-film silicon PV modules
Coordinator: Imperbel N.V. (BE)
With millions of square meters of available flat roof surfaces with PV conversion potential, PV roofing membranes have a huge potential for mass deployment. However, currently, major issues still hinder this deployment: adhesives or barrier encapsulants of the existing flexible PV roofs don’t meet yet the same reliability as standard construction materials and BIPV is still expensive. The PV-GUM project aims at developing new manufacturing technologies and equipments which will produce a low cost highly efficient flexibly BIPV solar cell on a bituminous roofing membrane (thanks to their prove…
About Seventh Framework Programme (2007–2013)
The Seventh Framework Programme (FP7) ran from 2007 to 2013 and was the EU's main research-funding instrument of that period. It mobilised roughly €50 billion across cooperation projects, ERC frontier grants, Marie Curie fellowships, capacity-building actions and Euratom research. FP7 closed to new calls in 2013 but its projects continued for years after under their original grant agreements.
EU contribution: €6.2M awarded to the consortium. The project runs over approximately 4.5 years from 2010-11-01 to 2015-04-30.
Full record on CORDIS — partners, deliverables, publications, news.
Open on cordis.europa.eu →More from BE
see all →- H2020 — COST at a turning point: A unique framework for pan-European ST cooperation as clear demonstration of European values681463 · H2020 · €178.2M
- SGA1-HE — COST: Europe's most empowering research programme Strengthening science and innovation through research networking101052416 · HORIZON · €153.0M
- HBP SGA3 — Human Brain Project Specific Grant Agreement 3945539 · H2020 · €150.0M
- SGA2 — COST: Europe's most empowering research programme Strengthening science and innovation through research networking101197135 · HORIZON · €120.0M
- SGA3 — COST - Maximising impact861952 · H2020 · €81.8M
- EIT Digital BP — EIT Digital Sustainable Growth101113245 · HORIZON · €33.7M
Other FP7 projects
see all →- COST II — Provision of Scientific, Technical and Administrative Management of COST200443 · FR · €250.0M
- COMBACTE-NET — Combatting Bacterial Resistance in Europe115523 · SE · €109.4M
- EUC²LID — European Lead Factory115489 · DE · €80.0M
- COMBACTE-MAGNET — Combatting Bacterial Resistance in Europe - Molecules against Gram Negative Infections115737 · SE · €75.3M
- ENABLE — European Gram Negative Antibacterial Engine115583 · UK · €58.9M
- PLACES2BE — Pilot Lines for Advanced CMOS EmbodimentS in 2x nodes, Built in Europe325633 · FR · €52.6M
Frequently asked questions
- Who funds this research project?
- This project is funded by the European Union through the Seventh Framework Programme (2007–2013) programme, under the CP funding scheme.
- What is the EU contribution?
- The European Commission contributes €6.2M.
- Which EU programme funds it?
- The project is funded under Seventh Framework Programme (2007–2013).
- Who coordinates the project?
- The project is coordinated by Imperbel N.V. (BE).
- What is the project timeline?
- The project runs from 2010-11-01 to 2015-04-30 — approximately 4.5 years.
- Where can I find the full project record?
- The complete record — partners, deliverables, publications and news — is published on CORDIS under project ID 249791.