KOHESIO · Q3103492 · SK
Increasing passive safety on Class I roads in PO and KE county 1st stage
The improvement of passive safety on 1st class roads solves the implementation of structural and safety measures on the road section in order to increase safety, fluidity and comfort of transport. The aim is to provide clear, comprehensible and quickly understandable information about the crossing, which will create more time for the driver in the decision-making process for solving unexpected situation at the intersection (collision with pedestrians, enforcement of priority in driving, etc.). Based on the above, measures will be implemented on the road I/18 Svinia – Michalovce. The designed …
About the Sustainable transport and network infrastructure objective
Thematic Objective 7 funds sustainable transport and network infrastructure: TEN-T core-network completion, rail electrification, urban mobility, ports and inland-waterway upgrades.
Co-funding: the EU contributes €8.0M toward a total project cost of €9.4M — a co-funding rate of 85%, with the remainder covered by national, regional or private sources.
Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.
Full project record on Kohesio — partners, deliverables, location map, related funding decisions.
Open on kohesio.ec.europa.eu →More projects in SK
see all →- D1 For ov, west For ov, southQ3102572 · €278.3M
- D1 Hričovské Podhradie – Lietavská Lúčka, Phase IIQ3100618 · €173.0M
- Restoration of state-owned national cultural monuments (NP NKP)Q7468370 · €157.9M
- D3 Žilina Strážov – Žilina Brodno (2nd phase)Q3108113 · €124.2M
- I/68 Sabinov, road foldingQ7467964 · €105.3M
- Modernisation of tram lines in Košice – stage 2 – part 1Q3108092 · €80.3M
Same objective, other countries
see all →- Rehabilitation of the Railway Line Border-Curtici-Simeria, component of the IV Pan-European Corridor, for the trains circulations with a maximum speed of 160 km/h, Section 2: Km 614 – Gurasada and Section 3: Gurasada – SimeriaQ3095706 · RO · €1.54B
- Preparation of the Sibiu – Pitesti Highway project and the construction of Sections 1, 4 and 5Q3095629 · RO · €610.1M
- Construction of the A1 motorway, the end of the Czestochowa – Tuszyn ring roadQ2693001 · PL · €407.6M
- Highway Sebes – TurdaQ3100002 · RO · €275.4M
- Construction of ERTMS/GSM-R system infrastructure on PKP Polskie Linie Kolejowe S.A. railway lines within ERTMS NPWQ85996 · PL · €266.3M
- Modernisation of the Püspökladány-Debrecen railway line, preparation of the partial reconstruction of Debrecen station and the construction of an ETCS train control system on the Szajol-Debrecen railway lineQ3942980 · HU · €258.9M
Frequently asked questions
- What is the EU budget for this project?
- The EU contributes €8.0M toward a total project cost of €9.4M, a co-funding rate of 85%.
- Which fund or thematic objective does it belong to?
- This project falls under EU Cohesion Policy thematic objective TO07 — Sustainable transport and network infrastructure — financed through the European Structural and Investment Funds.
- Which country is the project located in?
- The project is located in SK.
- What is the project period?
- The project runs from 2014-12-01 to 2022-06-01.
- Where can I find the full project record?
- The complete project record — beneficiary, location and related funding decisions — is published on Kohesio, the European Commission's open-data platform, under reference Q3103492.