Cross-border connection between the villages of Vysoká pri Morave and Marchegg in the form of a bicycle crossing over the Morava River
Due to the lack of bridging, the March River continues to be a natural barrier in the cross-border region. As a result of the lack of bridging, the inhabitants of the region have a limited opportunity to use sustainable transport and deteriorate accessibility to the goals to be achieved on a daily basis. In the last decade, it is possible to observe a dramatic increase in the proportion of individual passenger transport and thereby also increase the environmental impact of emissions and noise. The construction of the pedestrian and cycle bridge between the major regional and international tra…
About the Sustainable transport and network infrastructure objective
Thematic Objective 7 funds sustainable transport and network infrastructure: TEN-T core-network completion, rail electrification, urban mobility, ports and inland-waterway upgrades.
Co-funding: the EU contributes €5.2M toward a total project cost of €5.9M — a co-funding rate of 89%, with the remainder covered by national, regional or private sources.
Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.
Full project record on Kohesio — partners, deliverables, location map, related funding decisions.
Open on kohesio.ec.europa.eu →More projects in AT
see all →- Construction of a production and storage hallQ7500856 · €13.7M
- Quality and sustainability offensive 2024Q7501004 · €8.5M
- Supergrätzl Favorites - Climate adaptation measuresQ7501023 · €7.6M
- Modernization of the access to the border crossing Czech Republic / Austria Zadní Zvonková - Schöneben (ATCZ179)Q4296482 · €6.2M
- Construction Additional construction in wood construction as well as new construction Sauna and wellness areaQ7500870 · €5.0M
- Innovative ViennaQ7500913 · €4.7M
Same objective, other countries
see all →- Rehabilitation of the Railway Line Border-Curtici-Simeria, component of the IV Pan-European Corridor, for the trains circulations with a maximum speed of 160 km/h, Section 2: Km 614 – Gurasada and Section 3: Gurasada – SimeriaQ3095706 · RO · €1.54B
- Preparation of the Sibiu – Pitesti Highway project and the construction of Sections 1, 4 and 5Q3095629 · RO · €610.1M
- Construction of the A1 motorway, the end of the Czestochowa – Tuszyn ring roadQ2693001 · PL · €407.6M
- D1 For ov, west For ov, southQ3102572 · SK · €278.3M
- Highway Sebes – TurdaQ3100002 · RO · €275.4M
- Construction of ERTMS/GSM-R system infrastructure on PKP Polskie Linie Kolejowe S.A. railway lines within ERTMS NPWQ85996 · PL · €266.3M
Frequently asked questions
- What is the EU budget for this project?
- The EU contributes €5.2M toward a total project cost of €5.9M, a co-funding rate of 89%.
- Which fund or thematic objective does it belong to?
- This project falls under EU Cohesion Policy thematic objective TO07 — Sustainable transport and network infrastructure — financed through the European Structural and Investment Funds.
- Which country is the project located in?
- The project is located in AT.
- What is the project period?
- The project runs from 2017-06-01 to 2021-06-01.
- Where can I find the full project record?
- The complete project record — beneficiary, location and related funding decisions — is published on Kohesio, the European Commission's open-data platform, under reference Q4299082.