KOHESIO · Q85838 · PL
Construction of the S7 Radom Expressway (Jedlińsk) – Jędrzejów, bypass Radom
The project aims at the construction of the Radom bypass along the S7 expressway located in the TEN-T comprehensive network with a total length of 24.65 km. The beginning of the Radom ring road (designed km 0+ 000.00) is located in km 456+ 670,00 of the existing national road No. 7, in the plain area of Jedlińsk commune in Radom County. The planned route does not use the existing road to which it connects via the “Radom North” junction, but turns southwards, avoiding Jedlińsk and a complex of fish ponds from the west. The road on a long stretch runs through agricultural land and meadows and p…
About the Sustainable transport and network infrastructure objective
Thematic Objective 7 funds sustainable transport and network infrastructure: TEN-T core-network completion, rail electrification, urban mobility, ports and inland-waterway upgrades.
Co-funding: the EU contributes €88.7M toward a total project cost of €104.3M — a co-funding rate of 85%, with the remainder covered by national, regional or private sources.
Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.
Full project record on Kohesio — partners, deliverables, location map, related funding decisions.
Open on kohesio.ec.europa.eu →More projects in PL
see all →- SME Liquidity Loan Fund – FPWP OP IRQ2687767 · €684.0M
- Construction of the A1 motorway, the end of the Czestochowa – Tuszyn ring roadQ2693001 · €407.6M
- Construction of the S6 section. Słupsk – DK6 (Bożepole Wielkie)Q7374976 · €345.0M
- RES developmentQ7374888 · €336.0M
- Construction of the S7 road, sec. Płońsk (S10) – GarlicQ7374962 · €299.2M
- Construction of ERTMS/GSM-R system infrastructure on PKP Polskie Linie Kolejowe S.A. railway lines within ERTMS NPWQ85996 · €266.3M
Same objective, other countries
see all →- Rehabilitation of the Railway Line Border-Curtici-Simeria, component of the IV Pan-European Corridor, for the trains circulations with a maximum speed of 160 km/h, Section 2: Km 614 – Gurasada and Section 3: Gurasada – SimeriaQ3095706 · RO · €1.54B
- Preparation of the Sibiu – Pitesti Highway project and the construction of Sections 1, 4 and 5Q3095629 · RO · €610.1M
- D1 For ov, west For ov, southQ3102572 · SK · €278.3M
- Highway Sebes – TurdaQ3100002 · RO · €275.4M
- Modernisation of the Püspökladány-Debrecen railway line, preparation of the partial reconstruction of Debrecen station and the construction of an ETCS train control system on the Szajol-Debrecen railway lineQ3942980 · HU · €258.9M
- Acquisition of new railway electric units to the property of the South Moravian RegionQ4590904 · CZ · €224.8M
Frequently asked questions
- What is the EU budget for this project?
- The EU contributes €88.7M toward a total project cost of €104.3M, a co-funding rate of 85%.
- Which fund or thematic objective does it belong to?
- This project falls under EU Cohesion Policy thematic objective TO07 — Sustainable transport and network infrastructure — financed through the European Structural and Investment Funds.
- Which country is the project located in?
- The project is located in PL.
- What is the project period?
- The project runs from 2014-01-01 to 2019-06-30.