CORDIS · 608790 · FP7
TRIBUTE Take the energy bill back to the promised building performance
Coordinator: CSEM CENTRE SUISSE D'ELECTRONIQUE ET DE MICROTECHNIQUE SA - RECHERCHE ET DEVELOPPEMENT (CH)
Today, Building Energy Performance Simulation (BEPS) analysis tends to show a large discrepancy with real energy performance. Most cases are due to gross mistakes rather than fundamental inadequacy of available technology and methods. The reasons are manifold. Highly simplified calculation methods are used far beyond their domain of validity. Assumed boundary conditions such as occupant behaviour are not in accordance with actual usage; gross malfunctions in control and HVAC systems are left undetected in the commissioning process, while thermal bridges and distribution system losses are left…
About Seventh Framework Programme (2007–2013)
The Seventh Framework Programme (FP7) ran from 2007 to 2013 and was the EU's main research-funding instrument of that period. It mobilised roughly €50 billion across cooperation projects, ERC frontier grants, Marie Curie fellowships, capacity-building actions and Euratom research. FP7 closed to new calls in 2013 but its projects continued for years after under their original grant agreements.
EU contribution: €6.7M awarded to the consortium. The project runs over approximately 4 years from 2013-10-01 to 2017-09-30.
Full record on CORDIS — partners, deliverables, publications, news.
Open on cordis.europa.eu →More from CH
see all →- HBP SGA1 — Human Brain Project Specific Grant Agreement 1720270 · H2020 · €89.0M
- HBP SGA2 — Human Brain Project Specific Grant Agreement 2785907 · H2020 · €88.0M
- ATTRACT2 — Breakthrough Innovation Programme for a Pan-European Detection and Imaging Eco-System – Phase-2101004462 · H2020 · €35.0M
- STEMBANCC — Stem cells for Biological Assays of Novel drugs and prediCtive toxiCology (StemBANCC)115439 · FP7 · €26.0M
- IABC PROGRAMME — iABC Programme115721 · FP7 · €24.3M
- ULTRA-DD — Unrestricted Leveraging of Targets for Research Advancement and Drug Discovery115766 · FP7 · €21.2M
Other FP7 projects
see all →- COST II — Provision of Scientific, Technical and Administrative Management of COST200443 · FR · €250.0M
- COMBACTE-NET — Combatting Bacterial Resistance in Europe115523 · SE · €109.4M
- EUC²LID — European Lead Factory115489 · DE · €80.0M
- COMBACTE-MAGNET — Combatting Bacterial Resistance in Europe - Molecules against Gram Negative Infections115737 · SE · €75.3M
- ENABLE — European Gram Negative Antibacterial Engine115583 · UK · €58.9M
- PLACES2BE — Pilot Lines for Advanced CMOS EmbodimentS in 2x nodes, Built in Europe325633 · FR · €52.6M
Frequently asked questions
- Who funds this research project?
- This project is funded by the European Union through the Seventh Framework Programme (2007–2013) programme, under the CP-IP funding scheme.
- What is the EU contribution?
- The European Commission contributes €6.7M.
- Which EU programme funds it?
- The project is funded under Seventh Framework Programme (2007–2013).
- Who coordinates the project?
- The project is coordinated by CSEM CENTRE SUISSE D'ELECTRONIQUE ET DE MICROTECHNIQUE SA - RECHERCHE ET DEVELOPPEMENT (CH).
- What is the project timeline?
- The project runs from 2013-10-01 to 2017-09-30 — approximately 4 years.
- Where can I find the full project record?
- The complete record — partners, deliverables, publications and news — is published on CORDIS under project ID 608790.