KOHESIO · Q3942929 · HU

Main road 8 Székesfehérvár Western bypass construction of Stage III — phased project

Newly built 2x2 lane main road, complete with intersections and parallel roads for area insurance with associated junctions and artefacts, necessary public utility changes, environment and nature conservation works. Technical parameters of the main track: • Road category: K III A • Number of traffic lanes: 2x2 • Design speed Vt=110 km/h • Crown width: 23.6 m • Burkolat szélesség:2x7,5 m • Length of road: ~6720 m 2x2 traffic lane, high-speed first-class new tracked main road, complete with 2 separate level junctions, related structures, environmental protection, water engineering and other wor…

EU budget
€35.5M
Total project cost
€55.3M
Period
2013-06-24 → 2016-12-31
Thematic objective
TO07Sustainable transport and network infrastructure

About the Sustainable transport and network infrastructure objective

Thematic Objective 7 funds sustainable transport and network infrastructure: TEN-T core-network completion, rail electrification, urban mobility, ports and inland-waterway upgrades.

Co-funding: the EU contributes €35.5M toward a total project cost of €55.3M — a co-funding rate of 64%, with the remainder covered by national, regional or private sources.

Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.

Full project record on Kohesio — partners, deliverables, location map, related funding decisions.

Open on kohesio.ec.europa.eu →

Frequently asked questions

What is the EU budget for this project?
The EU contributes €35.5M toward a total project cost of €55.3M, a co-funding rate of 64%.
Which fund or thematic objective does it belong to?
This project falls under EU Cohesion Policy thematic objective TO07 — Sustainable transport and network infrastructure — financed through the European Structural and Investment Funds.
Which country is the project located in?
The project is located in HU.
What is the project period?
The project runs from 2013-06-24 to 2016-12-31.
Where can I find the full project record?
The complete project record — beneficiary, location and related funding decisions — is published on Kohesio, the European Commission's open-data platform, under reference Q3942929.