M7 motorway Érd, Iparos road junction preparation and construction

Road 8103 j. extends to 2x2 lanes from the underpass M7 to Törökbálinti út, and 4 traffic lights and 1 roundabout junction are being built as follows: — M7 motorway north junction — Industrial road — SHELL well junction: a signal-light node is built instead of a measly striped cleavage. — M7 motorway south junction — Iparos Road — Kárpitos u. junction: a signal-light node is built instead of a measly striped cleavage. — Industrial road — asphalt street — Kádár street junction: instead of signalling node and bus turn, the bus terminal is temporarily on the Hegesztő u. — asphalt street route, a…

EU budget
€3.8M
Total project cost
€6.1M
Period
2009-10-08 → 2017-05-31
Thematic objective
TO07Sustainable transport and network infrastructure

About the Sustainable transport and network infrastructure objective

Thematic Objective 7 funds sustainable transport and network infrastructure: TEN-T core-network completion, rail electrification, urban mobility, ports and inland-waterway upgrades.

Co-funding: the EU contributes €3.8M toward a total project cost of €6.1M — a co-funding rate of 63%, with the remainder covered by national, regional or private sources.

Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.

Full project record on Kohesio — partners, deliverables, location map, related funding decisions.

Open on kohesio.ec.europa.eu →

Frequently asked questions

What is the EU budget for this project?
The EU contributes €3.8M toward a total project cost of €6.1M, a co-funding rate of 63%.
Which fund or thematic objective does it belong to?
This project falls under EU Cohesion Policy thematic objective TO07 — Sustainable transport and network infrastructure — financed through the European Structural and Investment Funds.
Which country is the project located in?
The project is located in HU.
What is the project period?
The project runs from 2009-10-08 to 2017-05-31.