8th main road Várpalota bypass Phase II Pétfürdő junction (between 29+ 700-33+ 100 km)

Main road No 8 between 29+ 700-33+ 100 km: Length of intervention: 3 400 m Crown width: 2x2 band + stabilised stop lane: For a double-sided accelerator deceleration bar of 22.50 m: Correction of road 28.00 m 7207: Length: 299.24 m Crown width: 11.00 m Várpalota connecting road: Length: 1 100 m Crown width: 11.00 m Crossroad road: Length: 150.39 m Crown width: 11.00 m dirt roads: Total ~ 1 926 m Crown width: 5.00 m Level nodes: 2 Pcs Circular Nodes Artifacts: Building 1 separate level node: Main road no. 8 31+ 251.23 km road underpass bridge (free opening: 31.94 m, 30.39 m perpendicular) 1 ped…

EU budget
€16.4M
Total project cost
€24.5M
Period
2016-09-15 → 2021-02-01
Thematic objective
TO07Sustainable transport and network infrastructure

About the Sustainable transport and network infrastructure objective

Thematic Objective 7 funds sustainable transport and network infrastructure: TEN-T core-network completion, rail electrification, urban mobility, ports and inland-waterway upgrades.

Co-funding: the EU contributes €16.4M toward a total project cost of €24.5M — a co-funding rate of 67%, with the remainder covered by national, regional or private sources.

Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.

Full project record on Kohesio — partners, deliverables, location map, related funding decisions.

Open on kohesio.ec.europa.eu →

Frequently asked questions

What is the EU budget for this project?
The EU contributes €16.4M toward a total project cost of €24.5M, a co-funding rate of 67%.
Which fund or thematic objective does it belong to?
This project falls under EU Cohesion Policy thematic objective TO07 — Sustainable transport and network infrastructure — financed through the European Structural and Investment Funds.
Which country is the project located in?
The project is located in HU.
What is the project period?
The project runs from 2016-09-15 to 2021-02-01.
Where can I find the full project record?
The complete project record — beneficiary, location and related funding decisions — is published on Kohesio, the European Commission's open-data platform, under reference Q3942937.