Construction of road works in Szent István Street, Érd, with road construction connecting over railway lines 30 and 40

Originally, the project was to be implemented in project No KÖZOP-2.5.0-09-11-2013-0001 “Reconstruction of the Budapest-Kelenföld-Székesfehérvár railway line 1/3, the reconstruction of the Székesfehérvár station”, but in May 2015 it will be implemented as a separate IKOP project, based on the position of the EU Commission. Implementation of the construction of road structures and connecting roads in Érd Szent István út as follows: Planning tasks: — Up-to-date review of the available plans — redesign of the structure above railway line 30, the location of the interconnecting track in Érd — Red…

EU budget
€3.6M
Total project cost
€5.4M
Period
2016-05-01 → 2019-04-30
Thematic objective
TO07Sustainable transport and network infrastructure

About the Sustainable transport and network infrastructure objective

Thematic Objective 7 funds sustainable transport and network infrastructure: TEN-T core-network completion, rail electrification, urban mobility, ports and inland-waterway upgrades.

Co-funding: the EU contributes €3.6M toward a total project cost of €5.4M — a co-funding rate of 67%, with the remainder covered by national, regional or private sources.

Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.

Full project record on Kohesio — partners, deliverables, location map, related funding decisions.

Open on kohesio.ec.europa.eu →

Frequently asked questions

What is the EU budget for this project?
The EU contributes €3.6M toward a total project cost of €5.4M, a co-funding rate of 67%.
Which fund or thematic objective does it belong to?
This project falls under EU Cohesion Policy thematic objective TO07 — Sustainable transport and network infrastructure — financed through the European Structural and Investment Funds.
Which country is the project located in?
The project is located in HU.
What is the project period?
The project runs from 2016-05-01 to 2019-04-30.
Where can I find the full project record?
The complete project record — beneficiary, location and related funding decisions — is published on Kohesio, the European Commission's open-data platform, under reference Q3942977.