Implementation of main road no. 47 Hódmezővásárhely bypass

Preparation of the bypass section of main road 47 Hódmezővásárhely and the construction plans of the related facilities, further authorisation and construction works. Technical summary Trail of the main track: The initial section of the planned bypass section connects north of the city to the pavement of main road 47 reinforced to 115 kN axle load, from which it is branched with a junction ‘T’. The trail runs directly on the north side of R2 and then on the north side of irrigation channel R1. At Rárósi út, a level vehicle classification junction is built, after which it crosses main road No.…

EU budget
€51.9M
Total project cost
€106.0M
Period
2016-02-09 → 2018-10-31
Thematic objective
TO07Sustainable transport and network infrastructure

About the Sustainable transport and network infrastructure objective

Thematic Objective 7 funds sustainable transport and network infrastructure: TEN-T core-network completion, rail electrification, urban mobility, ports and inland-waterway upgrades.

Co-funding: the EU contributes €51.9M toward a total project cost of €106.0M — a co-funding rate of 49%, with the remainder covered by national, regional or private sources.

Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.

Full project record on Kohesio — partners, deliverables, location map, related funding decisions.

Open on kohesio.ec.europa.eu →

Frequently asked questions

What is the EU budget for this project?
The EU contributes €51.9M toward a total project cost of €106.0M, a co-funding rate of 49%.
Which fund or thematic objective does it belong to?
This project falls under EU Cohesion Policy thematic objective TO07 — Sustainable transport and network infrastructure — financed through the European Structural and Investment Funds.
Which country is the project located in?
The project is located in HU.
What is the project period?
The project runs from 2016-02-09 to 2018-10-31.
Where can I find the full project record?
The complete project record — beneficiary, location and related funding decisions — is published on Kohesio, the European Commission's open-data platform, under reference Q3943039.