Transport development in Borsod county 1.
In the framework of the project, a total of 65.564 km of the secondary road network will be refurbished. During the intervention, the profile milling of the existing casing is performed, and the new casing is formed by the installation of a binding and wear layer. The drainage is ensured by refurbishing the existing drainage system and by placing it in a good arm, and the road bench is also arranged. Works of art, penetrating and traffic equipment on the affected road section will be refurbished as necessary. Refurbished section: 2521 j. road (0+ 000-6+ 000 kms) intervention length: 6.00 km o…
About the Sustainable transport and network infrastructure objective
Thematic Objective 7 funds sustainable transport and network infrastructure: TEN-T core-network completion, rail electrification, urban mobility, ports and inland-waterway upgrades.
Co-funding: the EU contributes €14.1M toward a total project cost of €15.8M — a co-funding rate of 89%, with the remainder covered by national, regional or private sources.
Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.
Full project record on Kohesio — partners, deliverables, location map, related funding decisions.
Open on kohesio.ec.europa.eu →More projects in HU
see all →- Modernisation of the Püspökladány-Debrecen railway line, preparation of the partial reconstruction of Debrecen station and the construction of an ETCS train control system on the Szajol-Debrecen railway lineQ3942980 · €258.9M
- M35 motorway No. 4 — Main road 481, main road 481 — Berettyóújfalu section and implementation of main road 481Q3942932 · €169.0M
- M86 express road Szeleste — Csorna section II implementation Hegyfalu — Csorna section between 105+ 800-139+ 165 kmQ3942930 · €148.3M
- Development of digital competenceQ3898383 · €116.1M
- Püspökladány — Bihor Cross bottleneck replacement and electrificationQ3942979 · €115.0M
- Construction of the flood protection system of Felső-Tisza, Tisza-Túr reservoirQ3943245 · €86.3M
Same objective, other countries
see all →- Rehabilitation of the Railway Line Border-Curtici-Simeria, component of the IV Pan-European Corridor, for the trains circulations with a maximum speed of 160 km/h, Section 2: Km 614 – Gurasada and Section 3: Gurasada – SimeriaQ3095706 · RO · €1.54B
- Preparation of the Sibiu – Pitesti Highway project and the construction of Sections 1, 4 and 5Q3095629 · RO · €610.1M
- Construction of the A1 motorway, the end of the Czestochowa – Tuszyn ring roadQ2693001 · PL · €407.6M
- D1 For ov, west For ov, southQ3102572 · SK · €278.3M
- Highway Sebes – TurdaQ3100002 · RO · €275.4M
- Construction of ERTMS/GSM-R system infrastructure on PKP Polskie Linie Kolejowe S.A. railway lines within ERTMS NPWQ85996 · PL · €266.3M
Frequently asked questions
- What is the EU budget for this project?
- The EU contributes €14.1M toward a total project cost of €15.8M, a co-funding rate of 89%.
- Which fund or thematic objective does it belong to?
- This project falls under EU Cohesion Policy thematic objective TO07 — Sustainable transport and network infrastructure — financed through the European Structural and Investment Funds.
- Which country is the project located in?
- The project is located in HU.
- What is the project period?
- The project runs from 2017-04-05 to 2019-12-31.