KOHESIO · Q4295754 · DK
Automated Road Transport Forum for the North Sea Region
The technological development towards automated transport is fast. It is likely that automated road transport (ART) will change spatial development and the transport system in the North Sea Region and beyond in a fundamental way. Currently, much enabling of technological developments and test applications of automated vehicles can be observed but little guidance is being provided for public authorities on how to deal with these new technologies, particularly in their sustainable mobility plans, street design and regional development plans. In addition, not every aspect of the technology devel…
About the Sustainable transport and network infrastructure objective
Thematic Objective 7 funds sustainable transport and network infrastructure: TEN-T core-network completion, rail electrification, urban mobility, ports and inland-waterway upgrades.
Co-funding: the EU contributes €2.0M toward a total project cost of €4.3M — a co-funding rate of 45%, with the remainder covered by national, regional or private sources.
Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.
Full project record on Kohesio — partners, deliverables, location map, related funding decisions.
Open on kohesio.ec.europa.eu →More projects in DK
see all →- CLOSING LOOPS SJQ7525694 · €6.3M
- Development of Oxy-Fuel pyrolysis for daily conversion of 30 T biomass and sludge to energy and CO2 capture during simultaneous elimination of PFASQ7525688 · €4.9M
- Green and Circular Conversion in SMEs (GCO)Q2101016 · €4.6M
- Top soil and water - The climate challenge in the near subsurfaceQ4296151 · €4.2M
- CULTIGENQ7420753 · €3.8M
- PytoCCUSQ7525640 · €3.5M
Same objective, other countries
see all →- Rehabilitation of the Railway Line Border-Curtici-Simeria, component of the IV Pan-European Corridor, for the trains circulations with a maximum speed of 160 km/h, Section 2: Km 614 – Gurasada and Section 3: Gurasada – SimeriaQ3095706 · RO · €1.54B
- Preparation of the Sibiu – Pitesti Highway project and the construction of Sections 1, 4 and 5Q3095629 · RO · €610.1M
- Construction of the A1 motorway, the end of the Czestochowa – Tuszyn ring roadQ2693001 · PL · €407.6M
- D1 For ov, west For ov, southQ3102572 · SK · €278.3M
- Highway Sebes – TurdaQ3100002 · RO · €275.4M
- Construction of ERTMS/GSM-R system infrastructure on PKP Polskie Linie Kolejowe S.A. railway lines within ERTMS NPWQ85996 · PL · €266.3M
Frequently asked questions
- What is the EU budget for this project?
- The EU contributes €2.0M toward a total project cost of €4.3M, a co-funding rate of 45%.
- Which fund or thematic objective does it belong to?
- This project falls under EU Cohesion Policy thematic objective TO07 — Sustainable transport and network infrastructure — financed through the European Structural and Investment Funds.
- Which country is the project located in?
- The project is located in DK.
- What is the project period?
- The project runs from 2019-03-01 to 2022-09-30.
- Where can I find the full project record?
- The complete project record — beneficiary, location and related funding decisions — is published on Kohesio, the European Commission's open-data platform, under reference Q4295754.