Expansion of the existing road link St. Margarthen in Burgenland (L210) — Fertőrákos (8532)
The road L210 (St. Margarthener Straße) crosses the junction with the road L236 (Schützener Straße) at km 0,304 and runs through Oslip (Ödenburgerstraße). The road L210 crosses the B52 (Ruster Straße) at km 5,558 in St. Margarethen (Ödenburgerstraße). The L210 ends at the Hungarian border and is continued in the Hungarian road network. The stretch between St. Margarethen and the Hungarian border 4,4 km has been used for agricultural purposes for the past decades, and is therefore in very poor conditions. Since Hungary has signed the Schengen Agreement, this road connection has been used more …
About the Sustainable transport and network infrastructure objective
Thematic Objective 7 funds sustainable transport and network infrastructure: TEN-T core-network completion, rail electrification, urban mobility, ports and inland-waterway upgrades.
Co-funding: the EU contributes €2.1M toward a total project cost of €4.0M — a co-funding rate of 52%, with the remainder covered by national, regional or private sources.
Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.
Full project record on Kohesio — partners, deliverables, location map, related funding decisions.
Open on kohesio.ec.europa.eu →More projects in AT
see all →- Construction of a production and storage hallQ7500856 · €13.7M
- Quality and sustainability offensive 2024Q7501004 · €8.5M
- Supergrätzl Favorites - Climate adaptation measuresQ7501023 · €7.6M
- Modernization of the access to the border crossing Czech Republic / Austria Zadní Zvonková - Schöneben (ATCZ179)Q4296482 · €6.2M
- Cross-border connection between the villages of Vysoká pri Morave and Marchegg in the form of a bicycle crossing over the Morava RiverQ4299082 · €5.2M
- Construction Additional construction in wood construction as well as new construction Sauna and wellness areaQ7500870 · €5.0M
Same objective, other countries
see all →- Rehabilitation of the Railway Line Border-Curtici-Simeria, component of the IV Pan-European Corridor, for the trains circulations with a maximum speed of 160 km/h, Section 2: Km 614 – Gurasada and Section 3: Gurasada – SimeriaQ3095706 · RO · €1.54B
- Preparation of the Sibiu – Pitesti Highway project and the construction of Sections 1, 4 and 5Q3095629 · RO · €610.1M
- Construction of the A1 motorway, the end of the Czestochowa – Tuszyn ring roadQ2693001 · PL · €407.6M
- D1 For ov, west For ov, southQ3102572 · SK · €278.3M
- Highway Sebes – TurdaQ3100002 · RO · €275.4M
- Construction of ERTMS/GSM-R system infrastructure on PKP Polskie Linie Kolejowe S.A. railway lines within ERTMS NPWQ85996 · PL · €266.3M
Frequently asked questions
- What is the EU budget for this project?
- The EU contributes €2.1M toward a total project cost of €4.0M, a co-funding rate of 52%.
- Which fund or thematic objective does it belong to?
- This project falls under EU Cohesion Policy thematic objective TO07 — Sustainable transport and network infrastructure — financed through the European Structural and Investment Funds.
- Which country is the project located in?
- The project is located in AT.
- What is the project period?
- The project runs from 2017-06-01 to 2020-04-30.
- Where can I find the full project record?
- The complete project record — beneficiary, location and related funding decisions — is published on Kohesio, the European Commission's open-data platform, under reference Q4299879.