KOHESIO · Q3067954 · EE
Reconstruction of the Väo-Jüri section of Tallinn ring road No 11 (E265)
The road complying with the road requirements shall be constructed at I kl by adding the directions to the left of the existing road and from Pk 14+ 00 to the right. The Veneküla junction tunnel, viaducts of Väo and Lagedi railways, 2 Pirita-Upper Canal bridges, Karla and Hellfield viaducts will be built. 4 different intersections (with tunnels) will be upgraded. A new section will be built to connect Tallinn-Laged and Lagedi-Aruküla-Pening highways and light traffic routes to the Russian Village tunnel, to the viaducts of Karla and Hellfield and to connect Pildiküla and Jüri.
About the Sustainable transport and network infrastructure objective
Thematic Objective 7 funds sustainable transport and network infrastructure: TEN-T core-network completion, rail electrification, urban mobility, ports and inland-waterway upgrades.
Co-funding: the EU contributes €36.6M toward a total project cost of €43.1M — a co-funding rate of 85%, with the remainder covered by national, regional or private sources.
Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.
Full project record on Kohesio — partners, deliverables, location map, related funding decisions.
Open on kohesio.ec.europa.eu →More projects in EE
see all →- Electrification of the railway on the Tallinn-Tartu and Tapa-Narva lines (phase 1)Q7427143 · €192.3M
- Construction of the Pärnu-Uulu section of state road no. 4 Tallinn-Pärnu-IklaQ7427144 · €38.6M
- Conducting studies in the focus areas of TAIE's smart specialisation - with climate contribution (TemTa1)Q7424708 · €35.0M
- Construction of the Y Corps of the Black Mountain Medical Campus of the North Estonia Medical HospitalQ3068783 · €33.4M
- Revitalising and relaunching the Estonian tourism sectorQ7424899 · €33.2M
- Mobilitas PlussQ3069264 · €30.2M
Same objective, other countries
see all →- Rehabilitation of the Railway Line Border-Curtici-Simeria, component of the IV Pan-European Corridor, for the trains circulations with a maximum speed of 160 km/h, Section 2: Km 614 – Gurasada and Section 3: Gurasada – SimeriaQ3095706 · RO · €1.54B
- Preparation of the Sibiu – Pitesti Highway project and the construction of Sections 1, 4 and 5Q3095629 · RO · €610.1M
- Construction of the A1 motorway, the end of the Czestochowa – Tuszyn ring roadQ2693001 · PL · €407.6M
- D1 For ov, west For ov, southQ3102572 · SK · €278.3M
- Highway Sebes – TurdaQ3100002 · RO · €275.4M
- Construction of ERTMS/GSM-R system infrastructure on PKP Polskie Linie Kolejowe S.A. railway lines within ERTMS NPWQ85996 · PL · €266.3M
Frequently asked questions
- What is the EU budget for this project?
- The EU contributes €36.6M toward a total project cost of €43.1M, a co-funding rate of 85%.
- Which fund or thematic objective does it belong to?
- This project falls under EU Cohesion Policy thematic objective TO07 — Sustainable transport and network infrastructure — financed through the European Structural and Investment Funds.
- Which country is the project located in?
- The project is located in EE.
- What is the project period?
- The project runs from 2015-06-01 to 2021-12-31.