Reconstruction of State Road No 3 (E264) Jõhvi-Tartu-Valga Mustvee bypass between kilometres 67,1-75.3

The road cover shall be reconstructed in order to meet the fourth class width parameters and the prospective load frequency. The objectives will be achieved without changing the design of the existing road by correcting the cross-profile, improving lateral visibility and cleaning off runs. The Blackvee junction will be rebuilt and lighting will be built on it. New road signs shall be installed, the road marking and the road sign system shall be reorganised. A resting place for heavy trucks will be created in the Blackwater intersection area.

EU budget
€2.4M
Total project cost
€2.9M
Period
2016-05-01 → 2018-03-31
Thematic objective
TO07Sustainable transport and network infrastructure

About the Sustainable transport and network infrastructure objective

Thematic Objective 7 funds sustainable transport and network infrastructure: TEN-T core-network completion, rail electrification, urban mobility, ports and inland-waterway upgrades.

Co-funding: the EU contributes €2.4M toward a total project cost of €2.9M — a co-funding rate of 85%, with the remainder covered by national, regional or private sources.

Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.

Full project record on Kohesio — partners, deliverables, location map, related funding decisions.

Open on kohesio.ec.europa.eu →

Frequently asked questions

What is the EU budget for this project?
The EU contributes €2.4M toward a total project cost of €2.9M, a co-funding rate of 85%.
Which fund or thematic objective does it belong to?
This project falls under EU Cohesion Policy thematic objective TO07 — Sustainable transport and network infrastructure — financed through the European Structural and Investment Funds.
Which country is the project located in?
The project is located in EE.
What is the project period?
The project runs from 2016-05-01 to 2018-03-31.
Where can I find the full project record?
The complete project record — beneficiary, location and related funding decisions — is published on Kohesio, the European Commission's open-data platform, under reference Q3067969.