KOHESIO · Q3067973 · EE

Construction of a two-level junction of the railway of Tallinn-Narva and Sillamäe Harbour and the reconstruction of the section of the city of Sillamäe. Step I.

The following improvements to the LOD are proposed: a new 9 m wide road will be built; 3 different level junctions for car traffic will be built and a different level rail crossing will be built to increase road throughput; the same level intersections and exits shall be arranged; the construction of a network of collector and light traffic throughout the project area and a pedestrian tunnel to separate local and light traffic from transit traffic; the road marking and the road signage system shall be refurbished.

EU budget
€6.0M
Total project cost
€7.1M
Period
2016-08-01 → 2018-01-01
Thematic objective
TO07Sustainable transport and network infrastructure

About the Sustainable transport and network infrastructure objective

Thematic Objective 7 funds sustainable transport and network infrastructure: TEN-T core-network completion, rail electrification, urban mobility, ports and inland-waterway upgrades.

Co-funding: the EU contributes €6.0M toward a total project cost of €7.1M — a co-funding rate of 85%, with the remainder covered by national, regional or private sources.

Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.

Full project record on Kohesio — partners, deliverables, location map, related funding decisions.

Open on kohesio.ec.europa.eu →

Frequently asked questions

What is the EU budget for this project?
The EU contributes €6.0M toward a total project cost of €7.1M, a co-funding rate of 85%.
Which fund or thematic objective does it belong to?
This project falls under EU Cohesion Policy thematic objective TO07 — Sustainable transport and network infrastructure — financed through the European Structural and Investment Funds.
Which country is the project located in?
The project is located in EE.
What is the project period?
The project runs from 2016-08-01 to 2018-01-01.
Where can I find the full project record?
The complete project record — beneficiary, location and related funding decisions — is published on Kohesio, the European Commission's open-data platform, under reference Q3067973.