KOHESIO · Q3067975 · EE
State Road No. 4 (E67) Tallinn-Pärnu-Ikla km 28-37 Ääsmäe – Construction of an unplaced section
The project for the construction of the section of State Road No 4 (E67) Tallinn-Pärnu-Ikla km 28-37 Ääsmäe-Kohatu provides for the construction of an existing highway with a 2+ 1 cross-section to improve road safety and driving comfort. The junctions and departures on the road section will be brought into line with the current standards. Traffic control devices and road pavement markings will be upgraded and marker posts will be installed on the entire road section. The Kernu Bridge and the Appropriate Ecoduct across the Vasalemma River will be built.
About the Sustainable transport and network infrastructure objective
Thematic Objective 7 funds sustainable transport and network infrastructure: TEN-T core-network completion, rail electrification, urban mobility, ports and inland-waterway upgrades.
Co-funding: the EU contributes €12.8M toward a total project cost of €15.0M — a co-funding rate of 85%, with the remainder covered by national, regional or private sources.
Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.
Full project record on Kohesio — partners, deliverables, location map, related funding decisions.
Open on kohesio.ec.europa.eu →More projects in EE
see all →- Electrification of the railway on the Tallinn-Tartu and Tapa-Narva lines (phase 1)Q7427143 · €192.3M
- Construction of the Pärnu-Uulu section of state road no. 4 Tallinn-Pärnu-IklaQ7427144 · €38.6M
- Reconstruction of the Väo-Jüri section of Tallinn ring road No 11 (E265)Q3067954 · €36.6M
- Conducting studies in the focus areas of TAIE's smart specialisation - with climate contribution (TemTa1)Q7424708 · €35.0M
- Construction of the Y Corps of the Black Mountain Medical Campus of the North Estonia Medical HospitalQ3068783 · €33.4M
- Revitalising and relaunching the Estonian tourism sectorQ7424899 · €33.2M
Same objective, other countries
see all →- Rehabilitation of the Railway Line Border-Curtici-Simeria, component of the IV Pan-European Corridor, for the trains circulations with a maximum speed of 160 km/h, Section 2: Km 614 – Gurasada and Section 3: Gurasada – SimeriaQ3095706 · RO · €1.54B
- Preparation of the Sibiu – Pitesti Highway project and the construction of Sections 1, 4 and 5Q3095629 · RO · €610.1M
- Construction of the A1 motorway, the end of the Czestochowa – Tuszyn ring roadQ2693001 · PL · €407.6M
- D1 For ov, west For ov, southQ3102572 · SK · €278.3M
- Highway Sebes – TurdaQ3100002 · RO · €275.4M
- Construction of ERTMS/GSM-R system infrastructure on PKP Polskie Linie Kolejowe S.A. railway lines within ERTMS NPWQ85996 · PL · €266.3M
Frequently asked questions
- What is the EU budget for this project?
- The EU contributes €12.8M toward a total project cost of €15.0M, a co-funding rate of 85%.
- Which fund or thematic objective does it belong to?
- This project falls under EU Cohesion Policy thematic objective TO07 — Sustainable transport and network infrastructure — financed through the European Structural and Investment Funds.
- Which country is the project located in?
- The project is located in EE.
- What is the project period?
- The project runs from 2016-08-30 to 2018-10-31.
- Where can I find the full project record?
- The complete project record — beneficiary, location and related funding decisions — is published on Kohesio, the European Commission's open-data platform, under reference Q3067975.