KOHESIO · Q3073529 · EE
Reconstruction of water and sewerage pipelines and waste water treatment plant in Haapsalu and Uusmõisa
4.5 km of water pipelines, 3.6 km of self-flowing sewerage pipelines, 1.95 km of pressure sewerage pipelines are being reconstructed. 2 waste water pumps are being reconstructed. 1 waste water pumping station, 0.15 km of water pipelines, 0.17 km of self-flow sewerage pipelines, 0.33 km of pressure sewerage pipelines will be built. Haapsalu RVPS will be reconstructed with grid system, coagulant pump system, pre-cleaner pumps, mud sealer reducer motor, sand trap system with automation, anaerobic tanks (8 in total).
About the Environment and resource efficiency objective
Thematic Objective 6 finances environment and resource efficiency — water and waste management, biodiversity protection, contaminated-site remediation, air quality, and the circular economy.
Co-funding: the EU contributes €1.8M toward a total project cost of €2.6M — a co-funding rate of 68%, with the remainder covered by national, regional or private sources.
Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.
Full project record on Kohesio — partners, deliverables, location map, related funding decisions.
Open on kohesio.ec.europa.eu →More projects in EE
see all →- Electrification of the railway on the Tallinn-Tartu and Tapa-Narva lines (phase 1)Q7427143 · €192.3M
- Construction of the Pärnu-Uulu section of state road no. 4 Tallinn-Pärnu-IklaQ7427144 · €38.6M
- Reconstruction of the Väo-Jüri section of Tallinn ring road No 11 (E265)Q3067954 · €36.6M
- Conducting studies in the focus areas of TAIE's smart specialisation - with climate contribution (TemTa1)Q7424708 · €35.0M
- Construction of the Y Corps of the Black Mountain Medical Campus of the North Estonia Medical HospitalQ3068783 · €33.4M
- Revitalising and relaunching the Estonian tourism sectorQ7424899 · €33.2M
Same objective, other countries
see all →- Regional project for the development of water and wastewater infrastructure in Dolj county, between 2014 and 2020Q3095605 · RO · €284.6M
- Regional project for the development of water and wastewater infrastructure in Hunedoara County, in 2014-2020Q4609221 · RO · €182.3M
- “Water supply and waste water treatment in Warsaw – Phase VI”Q85242 · PL · €163.5M
- Regional project for the development of water and wastewater infrastructure in Arges County, 2014-2020Q3095678 · RO · €144.7M
- The regional project for the development of water and wastewater infrastructure in Buzau county, between 2014 and 2020Q3095576 · RO · €120.1M
- Water supply and sewage treatment in Warsaw – Phase VQ85203 · PL · €119.5M
Frequently asked questions
- What is the EU budget for this project?
- The EU contributes €1.8M toward a total project cost of €2.6M, a co-funding rate of 68%.
- Which fund or thematic objective does it belong to?
- This project falls under EU Cohesion Policy thematic objective TO06 — Environment and resource efficiency — financed through the European Structural and Investment Funds.
- Which country is the project located in?
- The project is located in EE.
- What is the project period?
- The project runs from 2016-01-10 to 2018-06-30.
- Where can I find the full project record?
- The complete project record — beneficiary, location and related funding decisions — is published on Kohesio, the European Commission's open-data platform, under reference Q3073529.