KOHESIO · Q85076 · PL
Construction of rainwater and meltwater retention systems in Mielec Municipality
The project will be implemented in the area of two settlements – Osiedle Borek Niski and Osiedle Centrum. Borek Niski estate: The material scope of the task includes the construction of a water retention system for the Borek Niski estate in Mielec, which consists of: — reconstruction of the rainwater drainage system, construction of a storage tank with a capacity of about 2300 m³, construction of rainwater pumping stations and melt water. Task No.I of the Centre housing estate includes the construction of a system of rainwater retention and meltwater retention system for the Centre housing es…
About the Climate change adaptation, risk prevention objective
Thematic Objective 5 supports climate-change adaptation and risk prevention: flood defences, wildfire prevention, drought-management infrastructure, civil-protection systems, and ecosystem-based adaptation.
Co-funding: the EU contributes €3.9M toward a total project cost of €4.6M — a co-funding rate of 85%, with the remainder covered by national, regional or private sources.
Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.
Full project record on Kohesio — partners, deliverables, location map, related funding decisions.
Open on kohesio.ec.europa.eu →More projects in PL
see all →- SME Liquidity Loan Fund – FPWP OP IRQ2687767 · €684.0M
- Construction of the A1 motorway, the end of the Czestochowa – Tuszyn ring roadQ2693001 · €407.6M
- Construction of the S6 section. Słupsk – DK6 (Bożepole Wielkie)Q7374976 · €345.0M
- RES developmentQ7374888 · €336.0M
- Construction of the S7 road, sec. Płońsk (S10) – GarlicQ7374962 · €299.2M
- Construction of ERTMS/GSM-R system infrastructure on PKP Polskie Linie Kolejowe S.A. railway lines within ERTMS NPWQ85996 · €266.3M
Same objective, other countries
see all →- Construction of the flood protection system of Felső-Tisza, Tisza-Túr reservoirQ3943245 · HU · €86.3M
- Modernisation of the beautiful slide from Račinovac to Nova GradiškaQ2734052 · HR · €41.7M
- Upgrading of the Republic of Croatia’s fire-brigadeQ2734051 · HR · €28.9M
- Improving adaptation to climate change by strengthening the response capacity of the State Fire Rescue ServiceQ3777726 · LT · €20.7M
- Development and reconstruction of inland waterways II.Q3943229 · HU · €20.4M
- Banská Bystrica, protection of the intravalve from floodsQ3101634 · SK · €19.9M
Frequently asked questions
- What is the EU budget for this project?
- The EU contributes €3.9M toward a total project cost of €4.6M, a co-funding rate of 85%.
- Which fund or thematic objective does it belong to?
- This project falls under EU Cohesion Policy thematic objective TO05 — Climate change adaptation, risk prevention — financed through the European Structural and Investment Funds.
- Which country is the project located in?
- The project is located in PL.
- What is the project period?
- The project runs from 2014-01-01 to 2021-12-31.
- Where can I find the full project record?
- The complete project record — beneficiary, location and related funding decisions — is published on Kohesio, the European Commission's open-data platform, under reference Q85076.