KOHESIO · Q2734052 · HR

Modernisation of the beautiful slide from Račinovac to Nova Gradiška

A project for an exploratory share of a total length of 236.7 km from Račinovac to Nova Gradiška provides an urgent ‘but regression’ measure of increasing the safety of a dykes and is a roundabout by building coastal camps with poor drainage and service routes. Out of the 236.7 km of shares analysed, 41.3 % of the embankments have been identified without the required certainty from a stability point of view, whereas in 76.3 % of shares the existing service network is not adequate and constitutes a limitation on communication when implementing flood defences. The implementation of measures on …

EU budget
€41.7M
Total project cost
€49.1M
Period
2017-01-31 → 2023-08-31
Thematic objective
TO05Climate change adaptation, risk prevention

About the Climate change adaptation, risk prevention objective

Thematic Objective 5 supports climate-change adaptation and risk prevention: flood defences, wildfire prevention, drought-management infrastructure, civil-protection systems, and ecosystem-based adaptation.

Co-funding: the EU contributes €41.7M toward a total project cost of €49.1M — a co-funding rate of 85%, with the remainder covered by national, regional or private sources.

Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.

Full project record on Kohesio — partners, deliverables, location map, related funding decisions.

Open on kohesio.ec.europa.eu →

Frequently asked questions

What is the EU budget for this project?
The EU contributes €41.7M toward a total project cost of €49.1M, a co-funding rate of 85%.
Which fund or thematic objective does it belong to?
This project falls under EU Cohesion Policy thematic objective TO05 — Climate change adaptation, risk prevention — financed through the European Structural and Investment Funds.
Which country is the project located in?
The project is located in HR.
What is the project period?
The project runs from 2017-01-31 to 2023-08-31.
Where can I find the full project record?
The complete project record — beneficiary, location and related funding decisions — is published on Kohesio, the European Commission's open-data platform, under reference Q2734052.