KOHESIO · Q85090 · PL
Protection against flooding of the Klodzka Basin with particular emphasis on the protection of the city of Kłodzka
The aim of the project is to improve flood safety for residential housing of the Nysa Kłodzkia valley with particular emphasis on the city of Kłodzka. The project is expected to provide flood protection of 1237 inhabitants (Mk) for floods p=1 %. The project is carried out within the framework of the flood protection project in the Oder and Vistula basin (POPDOW) and constitutes Stage I of the Project entitled. “Flood protection of the Kłodzka Basin” (component 2 POPDOW). Ultimately, the implementation of Stage I and Stage II will provide a total protection of approx. 6300 Mk. The project is p…
About the Climate change adaptation, risk prevention objective
Thematic Objective 5 supports climate-change adaptation and risk prevention: flood defences, wildfire prevention, drought-management infrastructure, civil-protection systems, and ecosystem-based adaptation.
Co-funding: the EU contributes €88.7M toward a total project cost of €140.6M — a co-funding rate of 63%, with the remainder covered by national, regional or private sources.
Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.
Full project record on Kohesio — partners, deliverables, location map, related funding decisions.
Open on kohesio.ec.europa.eu →More projects in PL
see all →- SME Liquidity Loan Fund – FPWP OP IRQ2687767 · €684.0M
- Construction of the A1 motorway, the end of the Czestochowa – Tuszyn ring roadQ2693001 · €407.6M
- Construction of the S6 section. Słupsk – DK6 (Bożepole Wielkie)Q7374976 · €345.0M
- RES developmentQ7374888 · €336.0M
- Construction of the S7 road, sec. Płońsk (S10) – GarlicQ7374962 · €299.2M
- Construction of ERTMS/GSM-R system infrastructure on PKP Polskie Linie Kolejowe S.A. railway lines within ERTMS NPWQ85996 · €266.3M
Same objective, other countries
see all →- Construction of the flood protection system of Felső-Tisza, Tisza-Túr reservoirQ3943245 · HU · €86.3M
- Modernisation of the beautiful slide from Račinovac to Nova GradiškaQ2734052 · HR · €41.7M
- Upgrading of the Republic of Croatia’s fire-brigadeQ2734051 · HR · €28.9M
- Improving adaptation to climate change by strengthening the response capacity of the State Fire Rescue ServiceQ3777726 · LT · €20.7M
- Development and reconstruction of inland waterways II.Q3943229 · HU · €20.4M
- Banská Bystrica, protection of the intravalve from floodsQ3101634 · SK · €19.9M
Frequently asked questions
- What is the EU budget for this project?
- The EU contributes €88.7M toward a total project cost of €140.6M, a co-funding rate of 63%.
- Which fund or thematic objective does it belong to?
- This project falls under EU Cohesion Policy thematic objective TO05 — Climate change adaptation, risk prevention — financed through the European Structural and Investment Funds.
- Which country is the project located in?
- The project is located in PL.
- What is the project period?
- The project runs from 2014-01-01 to 2023-12-15.
- Where can I find the full project record?
- The complete project record — beneficiary, location and related funding decisions — is published on Kohesio, the European Commission's open-data platform, under reference Q85090.