HYDRAULIC SHELTER FOR SURFACE LANDSLIDE MOVEMENTS IN THE PUBLIC BAND, UPSTREAM AND DOWNSTREAM, OF THE UPSTREAM AND DOWNSTREAM OF MONTERVERGINE-ACQUA OF THE VEINS — BENEFICIARY OF THE COMMUNITIES OF THE PARTENO AND VALLO DI LAURO
PROJECT AIMING AT REHABILITATION, UPGRADING AND SECURING OF THE MAIN ROAD (MONTVERINE — WATER OF THE VEINS) AND SOME OF THE MAJOR AIB RUNWAYS WHICH CONNECT TO THE ABOVE BACKBONE. PROVIDES FOR THE RE-FUNCTIONING AND SAFETY OF THE CARRIAGEWAY OF THE ROAD THROUGH THE PARTIAL REFURBISHMENT OF THE OLD BALLAST AND THE CORRESPONDING NEW CONSTRUCTION OF THE ASPHALT CONCRETE, THE RESTORATION OF EXISTING MANHOLES AND DRAINS, AND NEW PIPES ADAPTED TO THE FRINGE MOVEMENTS, REHABILITATION OF ZELLE AND STORM WATER, SUPPLY AND LAYING DOWN A MIXED SAFETY ROAD BARRIER WITH METALS, BUILDING NATURAL ENGINEERING…
About the Climate change adaptation, risk prevention objective
Thematic Objective 5 supports climate-change adaptation and risk prevention: flood defences, wildfire prevention, drought-management infrastructure, civil-protection systems, and ecosystem-based adaptation.
Co-funding: the EU contributes €2.1M toward a total project cost of €2.8M — a co-funding rate of 75%, with the remainder covered by national, regional or private sources.
Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.
Full project record on Kohesio — partners, deliverables, location map, related funding decisions.
Open on kohesio.ec.europa.eu →More projects in IT
see all →- STIMULUS OCCUPANCY NOONQ626211 · €260.4M
- REGIONAL GROWTH FUND — DGR 311/2021Q4924078 · €150.0M
- MICRO-ENTERPRISES BONUSES FOR COVID-19 EMERGENCYQ4113528 · €100.0M
- CONSTRUCTION OF UNDERGROUND LINE AND STATION IN THE URBAN CENTER OF ANDRIA AND CONSTRUCTION STOP ANDRIA NORDQ4903015 · €72.9M
- INP-CLP-00004Q4086608 · €67.5M
- SALERNO PORT — RAIL AND ROAD LINKS. WEST OF THE SALERNO TRANSPORT SYSTEMQ2017479 · €45.4M
Same objective, other countries
see all →- Protection against flooding of the Klodzka Basin with particular emphasis on the protection of the city of KłodzkaQ85090 · PL · €88.7M
- Construction of the flood protection system of Felső-Tisza, Tisza-Túr reservoirQ3943245 · HU · €86.3M
- Modernisation of the beautiful slide from Račinovac to Nova GradiškaQ2734052 · HR · €41.7M
- Comprehensive project for adaptation of forests and forestry to climate change – low retention and prevention of water erosion in lowland areasQ85047 · PL · €40.8M
- Construction and reconstruction of rainwater drainage and adaptation of the rainwater drainage network to climate change in the city of BydgoszczQ85104 · PL · €34.4M
- Upgrading of the Republic of Croatia’s fire-brigadeQ2734051 · HR · €28.9M
Frequently asked questions
- What is the EU budget for this project?
- The EU contributes €2.1M toward a total project cost of €2.8M, a co-funding rate of 75%.
- Which fund or thematic objective does it belong to?
- This project falls under EU Cohesion Policy thematic objective TO05 — Climate change adaptation, risk prevention — financed through the European Structural and Investment Funds.
- Which country is the project located in?
- The project is located in IT.
- What is the project period?
- The project runs from 2010-12-16 to 2020-01-12.
- Where can I find the full project record?
- The complete project record — beneficiary, location and related funding decisions — is published on Kohesio, the European Commission's open-data platform, under reference Q2023241.