Dredging, construction and reconstruction of the Danube branch of Ráckeve (Soroksári)
The need to build a Tassi multifunctional drainage plant is justified by the need to keep water quality, quantity and ecological risks as low as possible. After the destruction of the former Tassi water draining artifact in 1956, water drainage is carried out through the Tassi lock as a necessary solution. Needs and shortcomings that underpin the need for the implementation of the Tassi multifunctional drainage artefact: — The amount of water flow that can be passed through the existing drainage artifact is insufficient and it is not technically possible to adapt it in that direction. The nec…
About the Climate change adaptation, risk prevention objective
Thematic Objective 5 supports climate-change adaptation and risk prevention: flood defences, wildfire prevention, drought-management infrastructure, civil-protection systems, and ecosystem-based adaptation.
Co-funding: the EU contributes €17.8M toward a total project cost of €20.9M — a co-funding rate of 85%, with the remainder covered by national, regional or private sources.
Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.
Full project record on Kohesio — partners, deliverables, location map, related funding decisions.
Open on kohesio.ec.europa.eu →More projects in HU
see all →- Modernisation of the Püspökladány-Debrecen railway line, preparation of the partial reconstruction of Debrecen station and the construction of an ETCS train control system on the Szajol-Debrecen railway lineQ3942980 · €258.9M
- M35 motorway No. 4 — Main road 481, main road 481 — Berettyóújfalu section and implementation of main road 481Q3942932 · €169.0M
- M86 express road Szeleste — Csorna section II implementation Hegyfalu — Csorna section between 105+ 800-139+ 165 kmQ3942930 · €148.3M
- Development of digital competenceQ3898383 · €116.1M
- Püspökladány — Bihor Cross bottleneck replacement and electrificationQ3942979 · €115.0M
- Construction of the flood protection system of Felső-Tisza, Tisza-Túr reservoirQ3943245 · €86.3M
Same objective, other countries
see all →- Protection against flooding of the Klodzka Basin with particular emphasis on the protection of the city of KłodzkaQ85090 · PL · €88.7M
- Modernisation of the beautiful slide from Račinovac to Nova GradiškaQ2734052 · HR · €41.7M
- Comprehensive project for adaptation of forests and forestry to climate change – low retention and prevention of water erosion in lowland areasQ85047 · PL · €40.8M
- Construction and reconstruction of rainwater drainage and adaptation of the rainwater drainage network to climate change in the city of BydgoszczQ85104 · PL · €34.4M
- Upgrading of the Republic of Croatia’s fire-brigadeQ2734051 · HR · €28.9M
- Protection against flooding of the city of SłubiceQ85078 · PL · €26.8M
Frequently asked questions
- What is the EU budget for this project?
- The EU contributes €17.8M toward a total project cost of €20.9M, a co-funding rate of 85%.
- Which fund or thematic objective does it belong to?
- This project falls under EU Cohesion Policy thematic objective TO05 — Climate change adaptation, risk prevention — financed through the European Structural and Investment Funds.
- Which country is the project located in?
- The project is located in HU.
- What is the project period?
- The project runs from 2016-07-05 to 2021-09-30.
- Where can I find the full project record?
- The complete project record — beneficiary, location and related funding decisions — is published on Kohesio, the European Commission's open-data platform, under reference Q3943235.