KOHESIO · Q3057353 · LV
Measures to prevent risks of flooding and coastal erosion caused by Lielupe river in Dubulti-Majori-Dzintari
Within the framework of the project "Prevention of flood and coastal erosion risks caused by Lielupe" in Dubulti-Majoros-Dzintaros" (henceforward – Project) it is planned to restore existing and build new anti-flood and coastal erosion protection structures along the Lielupe bank in Dubulti, Majori and Dzintari Dzintari territories. The project is planned to be implemented within 45 months and its total eligible costs are EUR 4641252,07. The costs will include the European Regional Development Fund (hereinafter – ERDF) funding, which is 69,5933 % or EUR 3230000,00; National public co-financin…
About the Climate change adaptation, risk prevention objective
Thematic Objective 5 supports climate-change adaptation and risk prevention: flood defences, wildfire prevention, drought-management infrastructure, civil-protection systems, and ecosystem-based adaptation.
Co-funding: the EU contributes €3.2M toward a total project cost of €4.6M — a co-funding rate of 70%, with the remainder covered by national, regional or private sources.
Kohesio is the European Commission's open-data platform for projects co-financed by the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund and the Just Transition Fund. It draws on lists of beneficiaries published by national managing authorities and harmonises them into a single EU-wide view.
Full project record on Kohesio — partners, deliverables, location map, related funding decisions.
Open on kohesio.ec.europa.eu →More projects in LV
see all →- Development of the port and logistics infrastructure necessary for the development of wind technology production in Kundzinsala.Q7432439 · €54.9M
- Improving the availability of electronic communication infrastructure in rural areasQ3056619 · €42.3M
- Renovation of inpatient treatment departments of SIA "Riga Eastern Clinical University Hospital"Q7431942 · €40.8M
- Support for post-doctoral researchQ3056296 · €40.4M
- Establishment of a cultural and sports quarter in the vicinity of GrizinkalnsQ3057463 · €39.0M
- Postdoctoral studiesQ7432130 · €37.8M
Same objective, other countries
see all →- Protection against flooding of the Klodzka Basin with particular emphasis on the protection of the city of KłodzkaQ85090 · PL · €88.7M
- Construction of the flood protection system of Felső-Tisza, Tisza-Túr reservoirQ3943245 · HU · €86.3M
- Modernisation of the beautiful slide from Račinovac to Nova GradiškaQ2734052 · HR · €41.7M
- Comprehensive project for adaptation of forests and forestry to climate change – low retention and prevention of water erosion in lowland areasQ85047 · PL · €40.8M
- Construction and reconstruction of rainwater drainage and adaptation of the rainwater drainage network to climate change in the city of BydgoszczQ85104 · PL · €34.4M
- Upgrading of the Republic of Croatia’s fire-brigadeQ2734051 · HR · €28.9M
Frequently asked questions
- What is the EU budget for this project?
- The EU contributes €3.2M toward a total project cost of €4.6M, a co-funding rate of 70%.
- Which fund or thematic objective does it belong to?
- This project falls under EU Cohesion Policy thematic objective TO05 — Climate change adaptation, risk prevention — financed through the European Structural and Investment Funds.
- Which country is the project located in?
- The project is located in LV.
- What is the project period?
- The project runs from 2018-09-04 to 2022-06-03.
- Where can I find the full project record?
- The complete project record — beneficiary, location and related funding decisions — is published on Kohesio, the European Commission's open-data platform, under reference Q3057353.